Quick Facts
Quick Facts for BBVA Compass Stadium
-
Seating Capacity
-
22,000 (7,000 lower sections)
-
Location
-
Downtown Houston, East End
-
Groundbreaking
-
February 5, 2011
-
Scheduled Opening
-
May 12, 2012
-
Estimated Cost
-
$95 million ($60 mill. construction, $20 mill. infrastructure, $15 mill. land)
-
Suites
-
33 main suites located less than 10 rows from playing field, 2 party suites located in southeast corner
-
Club Seating Capacity
-
c. 1,100
-
Avg. Concourse Width
-
30 feet
-
Concession Stands
-
Full service stands throughout stadium, Local vendor booths in south end zone
-
Restrooms
-
In excess of current building codes
-
Main Gates
-
4 main gates for fan entry/exit
-
ADA Accessibility
-
Stadium meets all ADA regulations
-
Main Video Board
-
25-ft x 40-ft LED high definition screen
-
Broadcast Booths
-
7 (4 radio, 3 TV)
-
Print Media Capacity
-
50
-
Playing Surface
-
Tifway 419 Bermuda grass, c. 90,000 square feet able to accommodate soccer, football, rugby, lacrosse
-
Stage
-
c. 5,000 square feet, located in south end zone with demountable seats and full rigging grid on canopy
-
Locker Rooms
-
1 Dynamo locker room, 4 multi-purpose team locker rooms
-
Site Size
-
12 acres (522,720 square feet)
-
Building Size
-
340,000 square feet
-
Highest Elevation
-
70 feet
-
Exterior Skin
-
94,000 square feet of aluminum panels
-
Panels
-
50 percent open to improve air flow
-
Structural Concrete
-
13,800 cubic yards
-
Structural Steel
-
2,200 tons
-
Site Concrete
-
3,200 cubic yards
-
Canopies
-
Extending 75 feet over east and west sidelines
-
Stage Canopy
-
Extending 125 feet over south end zone
-
Sustainability
-
BBVA Compass Stadium was awarded the LEED® Silver certification from the U.S. Green Building Council in December 2012. The stadium has been identified as a pioneering example of new construction and sustainable design and is considered a leader in transforming the building industry.
* all numbers are approximate and subject to modification *